Sudan 400t/d all mud cyanidation project

Sudan 400t/d all mud cyanidation project

< >
Case name:

Sudan 400t/d all mud cyanidation project

Location:
Sudan
Processing scale:
400t/d
Introduction:
The Sudan 400t/d whole mud cyanidation project selected by Ludong Mining Machinery was completed and put into operation. During the project, Ludong Mining Machinery provided customers with mineral processing experiments, mine design, complete equipment
Applicable equipment:
Crusher, ball mill, vibrating screen, leaching tank (carbon screen, carbon extractor, linear screen) high temperature and high pressure desorption electrolysis, molten gold furnace
Case description
Flow chart
Live picture

There are two main types of ore used in the gold ore beneficiation production line, which are activated by activated carbon directly from the cyanide pulp. The gold ore beneficiation production line is mainly used for flotation of gold concentrate or amalgamation, re-election of tailings. The other is muddy oxidized ore.

Equipment required for process

Vibration feeder

Jaw crusher

Cone crusher

Vibration sieve

Conveyor

Ball mill

Thickener

Plate filter press

Screw classifier

Addition of XNT Flocculant

Carbon leaching tank

Desorption electrolysis system


Process flow chart

金矿全泥氰化碳浆生产流程图

金矿全泥氰化碳浆生产流程图

上一篇
NaN

PRODUCT CENTER

NEWS

SERVICE

Tel:+86-535-8117966   Phone:+86-13589789857(Mr Cao)    E-mail: ldkuangji@163.com    Add: No. 189, Zhaojin Road, Zhaoyuan City, Shandong Province, China

Copyright © LuDong Mine Machinery Co., Ltd.           鲁ICP备09077777号-1       

 

ABOUT US